Mike Pagano, VP of James McHugh Construction. ASCE Geo-Institute, Pazzos, 311 S Wacker Dr. Chicago experience building the 3 towers totaling 2.2 Million sqft, pouring a total of 125,000 cubic yards of concrete and setting over 20 million pounds of reinforcing steel. All of this, over active CTA tunnels and using Top-Down Excavation method. Registration link: http://events.constantcontact.com/register/event?llr=5vbor5kab&oeidk=a07ejr5hy5ab7feb08c
For more information contact Chair Christopher Stohr [email protected]